Changchun water purification plant was once the mark of water supply culture in Changchun, and it is also an industrial precious relic.As a part of the Yitong river ecological management, water purification plant now has been transformed into the southern cultural and ecological park, where not only witness the history of various cultural relics, to create a more similar to the "798" Beijing art park. Ancient and modern collisions of different sparks, people are full of expectations. Recently, the Changchun Evening News reporter learned that, at the end of 11 this year, the main ecological garden construction projects completed, eleven will complete next year.
Circular parking systems for the first time
At the scene, workers are speeding up the construction of the park, underground garage and parking systems, very busy. The stereoscopic circular parking lot will be a landmark of the ecological garden. The parking lot looks similar to the planet, with a total of 10 floors, providing 80 parking spaces. At present, the parking lot has been fully started construction and is expected to be completed by the end of the year.
"Nanxi water culture ecological park" is an important node of Yitong River regulation project. Its base is on the main landscape axis of Yitong River and South Lake, which is very close to Nanxi wetland." According to the design of the ecological park landscape design institute responsible person, Jobon Dean, the construction of the ecological park landscape, including buildings, roads, repair and other cultural relics protection, will maximize the protection of ecological resources, respect for historical and cultural relics, to stimulate the vitality of the ecological city.
After the transformation, it will become a theme park for water culture in Northeast Asia. It will also be the most telling Park in Northeast China and become a habitat of animal and plant communities in the city.
2017年9月29日星期五
2017年9月4日星期一
Changchun high tech Zone will add three mechanical parking system
Recently learned from Changchun High-tech Zone, in order to solve the current and future parking contradictions, ease the pressure on urban road traffic, the development zone this year will be in the flow of traffic intensive areas to build three mechanical parking system.
Among them, a parking system is located on the east side of the modified road Grandview Hotel. Covers an area of 560 square meters, 8 million yuan investments, a total of 6 layers. The parking lot for the elevator lift self-propelled society parking lot, the current basic engineering and the main steel structure has been completed, is paving the track, will be put into use in late September. Built to accommodate 96 parking spaces, easy for hotel guests, the surrounding enterprises, and residents to use.
The other is the collection of parking spaces in Europe and Asia, located in the Eurasian gathering area. Plans to build mechanical parking berth 7840, covers an area of 69,000 square meters, about 400 million investment, plans to start in September this year, completed in December 2018. Current engineering geological survey has been completed 75%, the demolition has been completed 80%, is planning for approval. Early will build a 6,000 square meters parking buildings, has completed 50% of the main project. The parking lot put into use, will effectively ease the leap road, Eurasian store business district parking problems.
The third is the Pangu Road parking system(http://www.tadachina.com/). Plans to build mechanical parking space about 250, construction area of About 10,000 square meters, about 30 million yuan investment, are currently under construction design, plans to start in September this year, completed in December.
Among them, a parking system is located on the east side of the modified road Grandview Hotel. Covers an area of 560 square meters, 8 million yuan investments, a total of 6 layers. The parking lot for the elevator lift self-propelled society parking lot, the current basic engineering and the main steel structure has been completed, is paving the track, will be put into use in late September. Built to accommodate 96 parking spaces, easy for hotel guests, the surrounding enterprises, and residents to use.
The other is the collection of parking spaces in Europe and Asia, located in the Eurasian gathering area. Plans to build mechanical parking berth 7840, covers an area of 69,000 square meters, about 400 million investment, plans to start in September this year, completed in December 2018. Current engineering geological survey has been completed 75%, the demolition has been completed 80%, is planning for approval. Early will build a 6,000 square meters parking buildings, has completed 50% of the main project. The parking lot put into use, will effectively ease the leap road, Eurasian store business district parking problems.
The third is the Pangu Road parking system(http://www.tadachina.com/). Plans to build mechanical parking space about 250, construction area of About 10,000 square meters, about 30 million yuan investment, are currently under construction design, plans to start in September this year, completed in December.
2017年8月7日星期一
Changchun Red Mansion intelligent stereoscopic parking area opened this year, 5 stories high after its completion
The intelligent three-dimensional parking lot is 5 stories high and 273 parking spaces.
In August 3rd, Changchun Dongsheng Street and easy road intersection of a parking lot project site, construction project main body are orderly. The intelligent three-dimensional parking lot is 5 stories tall and 273 parking spaces.
At present, Changchun has started construction of 3 stereoscopic parking lots, namely, the Red Mansion stereoscopic parking lot, Jiahe stereoscopic parking lot in the economic development zone, and parking lot Jingyue district.
This year, 3 stereoscopic parking lots will be put into use and nearly 2000 parking spaces will be offered.
订阅:
博文 (Atom)






