The old residential buildings, hospitals, hot parks, scenic spots and railway stations with prominent parking contradictions.
The Shenzhen Municipal Transportation Commission said that by the end of 2016, Shenzhen city car ownership is about 2 million 850 thousand units,while there are only about 1 million 250 thousand parking spaces for the record by the police department, parking difficult contradictions, there are still about 1 million 600 thousand cars at night without standard parking spaces, especially in Luohu District as the old city of Shenzhen, all kinds of public facilities, the old residential parking contradiction is more prominent.
The cause of the situation:
First, due to the lack of forward-looking planning, the old district, hospitals and other facilities, with the increasing number of urban car ownership, the original planning parking space cannot meet the growing demand for parking;
Two, the social parking lot is seriously insufficient, and it has little effect on alleviating the contradiction between parking supply and demand;
Three, the development of public transport is relatively backward, indirectly induce the ownership and use of cars, and exacerbate the worsening parking contradiction.
In order to alleviate the parking problem, the Commission said, the second half of last year, Shenzhen has been the key to check about more than 100 old residential, hospital, hot Park, rail station and other units, select 45 point parking contradiction, with the recent transformation of the conditions to make recent construction plan, and has determined 15 parking facilities as the first batch of pilot projects, promote the implementation in 2017.
These pilot include City Maternal and child health care hospital, lotus North Village, Meilin village, and the Shenzhen Bay Park Sports Park, Haiyun Park and Lugang, Yuehai Plaza.
At the same time, in order to attract social capital to participate in the construction of mechanical parking facilities, Shenzhen Bay Coastal leisure belt has been considered as a social capital investment in the construction of mechanical parking systems facilities pilot projects.
2017年9月26日星期二
2017年9月25日星期一
Zibo may be building the parking systems to ease parking difficulties
According to reports, in 2017, Zibo Municipal Planning Bureau received 9 deputies to the Municipal People's Congress and 17 members of the municipal CPPCC Committee, a total of 26 pieces. Among them, with 5 pieces. Mainly related to traffic (5), urban construction (14), economic (2), health (1), social (4) 5 categories, 21 aspects of the content.
According to the delegates on the suggestions to solve the problems of city parking ", Zibo City Planning Bureau to carry out the city's public parking lot planning and construction work, to complete the" Zibo City Planning Bureau on the city's parking lot planning and construction of three-year action plan progress report "and were reported to the municipal government and the" three three-building office at present, have been included in the "three three construction" unified supervision office. In order to alleviate the parking pressure, Zibo has also formulated a series of preferential measures to encourage private capital investment, boosting the construction of parking systems projects.
Zibo city will further strengthen the construction of public transit hub, the bus to carry out intensive renovation project, continue to launch a number of new bus lines, the construction of multibus hub and bay bus station, and strive to 2020, the number of bus lines from the current 34 increased to 66, public transportation site 500 meters coverage will reach 100%. Moreover, the Zibo Municipal government is currently studying the construction of the main city public bicycle system, through green travel to protect the city's environmental protection, to solve traffic congestion and parking problems.
According to the delegates on the suggestions to solve the problems of city parking ", Zibo City Planning Bureau to carry out the city's public parking lot planning and construction work, to complete the" Zibo City Planning Bureau on the city's parking lot planning and construction of three-year action plan progress report "and were reported to the municipal government and the" three three-building office at present, have been included in the "three three construction" unified supervision office. In order to alleviate the parking pressure, Zibo has also formulated a series of preferential measures to encourage private capital investment, boosting the construction of parking systems projects.
Zibo city will further strengthen the construction of public transit hub, the bus to carry out intensive renovation project, continue to launch a number of new bus lines, the construction of multibus hub and bay bus station, and strive to 2020, the number of bus lines from the current 34 increased to 66, public transportation site 500 meters coverage will reach 100%. Moreover, the Zibo Municipal government is currently studying the construction of the main city public bicycle system, through green travel to protect the city's environmental protection, to solve traffic congestion and parking problems.
Zanhua Lane parking lot in the end of the month and put into use
Last night, while evening vehicles and pedestrians less time, Xiang Zanhua (Xianhe mosque) parking lot began laying around the road asphalt, to the scheduled 30 days this month to vote with the goal one step further.
At present, Zhanhua Xiang (Xianhe Temple) parking lot parking system debugging has been completed, with parking conditions. On September 18th and 19, parking lot respectively through the special equipment and fire inspection, at the end of the month began to lay the foundation. Special equipment inspection and Research Institute staff conducted a test equipment of high standards and strict requirements of each site one by one check vehicle garage, parking storage way, final equipment construction quality on the parking lot of the highly recognized, all pass the test equipment.
On September 19th, after nearly half a month's efforts, the parking lot completed the fire inspection and acceptance and made a record of acceptance. It is reported that after the completion of the acceptance, parking lot at the end of September will be put into operation. At present, the parking lot is charging system debugging.
Zanhua Xiang (Xianhe Temple) parking lot is located at the South Gate Street East, South Lane Zanhua is based on the old parking lot on the expansion of the form.
The parking area adopts mechanical lifting parking mode with a floor area of 2930 square meters and 5 floors, with a construction area of nearly 1500 square meters. The building height is 10 meters, and more than 200 motor vehicles can be parked.
Parking lot with Ganquan Road, Wen Henan Road two imports and export, and Wisteria Park parking, Ji Jia Wan parking lot, Lotus Pond underground parking lot, Wanjiafu parking lot together to solve the parking problem in Wenchang district.
At present, Zhanhua Xiang (Xianhe Temple) parking lot parking system debugging has been completed, with parking conditions. On September 18th and 19, parking lot respectively through the special equipment and fire inspection, at the end of the month began to lay the foundation. Special equipment inspection and Research Institute staff conducted a test equipment of high standards and strict requirements of each site one by one check vehicle garage, parking storage way, final equipment construction quality on the parking lot of the highly recognized, all pass the test equipment.
On September 19th, after nearly half a month's efforts, the parking lot completed the fire inspection and acceptance and made a record of acceptance. It is reported that after the completion of the acceptance, parking lot at the end of September will be put into operation. At present, the parking lot is charging system debugging.
Zanhua Xiang (Xianhe Temple) parking lot is located at the South Gate Street East, South Lane Zanhua is based on the old parking lot on the expansion of the form.
The parking area adopts mechanical lifting parking mode with a floor area of 2930 square meters and 5 floors, with a construction area of nearly 1500 square meters. The building height is 10 meters, and more than 200 motor vehicles can be parked.
Parking lot with Ganquan Road, Wen Henan Road two imports and export, and Wisteria Park parking, Ji Jia Wan parking lot, Lotus Pond underground parking lot, Wanjiafu parking lot together to solve the parking problem in Wenchang district.
2017年9月23日星期六
What are the necessary conditions for the establishment of parking systems?
1, stop the trolley car area should be used one-way traffic, the roadway must have sufficient width and ensure that the vehicle can be safely opened to the turning radius. In order to reduce the number of turns of the vehicle and keep the viewing distance in the range of 50 to 80 m, the roadway should try to maintain a straight line.
2, with the surrounding flammable, explosive objects, units and high-voltage facilities to strictly maintain the fire interval.
3, multi-story parking systems slopes should be arranged in the main building outside. When the conditions are not allowed to be arranged in the middle, two sides or both ends of the building, it is necessary to pay attention to the processing of the column net and the structure of the building for parking.
4, parking equipment should comply with a certain angle standard, the design should be combined with the plane of the parking area, the choice of the freest access to the car, occupying the smallest area of The parking area as a parking area for the parking area.
5, the independent parking systems layout can be divided into the parking area, warranty workshop, scheduling management area, auxiliary area.
6, underground garages are mainly used for parking. Other buildings are arranged on the ground. The floor area of The underground garage is determined by 70m2 / per standard car.
7, parking systems should be selected in the hydrogeological condition is good, the export around the spacious, the exhaust is not facing buildings, parks, squares and other polluted public places, to avoid avoiding groundwater and particularly complex geological structure.
8, multi-story parking garage locations and parking lot are basically the same. Only its geological conditions and basic engineering must meet the multi-story building design requirements.
2, with the surrounding flammable, explosive objects, units and high-voltage facilities to strictly maintain the fire interval.
3, multi-story parking systems slopes should be arranged in the main building outside. When the conditions are not allowed to be arranged in the middle, two sides or both ends of the building, it is necessary to pay attention to the processing of the column net and the structure of the building for parking.
4, parking equipment should comply with a certain angle standard, the design should be combined with the plane of the parking area, the choice of the freest access to the car, occupying the smallest area of The parking area as a parking area for the parking area.
5, the independent parking systems layout can be divided into the parking area, warranty workshop, scheduling management area, auxiliary area.
6, underground garages are mainly used for parking. Other buildings are arranged on the ground. The floor area of The underground garage is determined by 70m2 / per standard car.
7, parking systems should be selected in the hydrogeological condition is good, the export around the spacious, the exhaust is not facing buildings, parks, squares and other polluted public places, to avoid avoiding groundwater and particularly complex geological structure.
8, multi-story parking garage locations and parking lot are basically the same. Only its geological conditions and basic engineering must meet the multi-story building design requirements.
2017年9月22日星期五
Encourage social capital to invest in building parking lots to solve parking problems
Anhui Provincial Hospital was admitted to Hefei City, parking difficult areas, whenever the peak hours to work, a lot of vehicles, no place to stop.
In May this year, the hospital's new intelligent parking floor officially put on, parking problems have been effectively alleviated. Reporters recently in the provincial hospital to see, parking inside a row of vehicles stacked layers, parking spaces like the same as the rotation of the Ferris wheel, less than 1 minute to complete the car.
"The original can only accommodate 20 vehicles in the region, transformed into parking systems after the parking spaces increased to 120. Space utilization increased by 6 times." The person in charge of the scene, this set of the Internet, handling robots, parking systems as one of the wisdom Parking mode, to maximize the increase in the number of parking spaces, effectively improve the parking turnover efficiency.
"To solve the parking is difficult, the key to increase parking spaces, to encourage social capital investment in the construction of a parking lot, especially the efficient operation of the intelligent parking lot." Some people think that the current parking lot construction. Still, face management system barriers. Construction Committee, traffic police, urban management and other long supervision, examination and approval of cumbersome, investment to build a parking lot, involving more than a dozen departments, to cover a lot of chapters, very troublesome.
In May this year, the hospital's new intelligent parking floor officially put on, parking problems have been effectively alleviated. Reporters recently in the provincial hospital to see, parking inside a row of vehicles stacked layers, parking spaces like the same as the rotation of the Ferris wheel, less than 1 minute to complete the car.
"The original can only accommodate 20 vehicles in the region, transformed into parking systems after the parking spaces increased to 120. Space utilization increased by 6 times." The person in charge of the scene, this set of the Internet, handling robots, parking systems as one of the wisdom Parking mode, to maximize the increase in the number of parking spaces, effectively improve the parking turnover efficiency.
"To solve the parking is difficult, the key to increase parking spaces, to encourage social capital investment in the construction of a parking lot, especially the efficient operation of the intelligent parking lot." Some people think that the current parking lot construction. Still, face management system barriers. Construction Committee, traffic police, urban management and other long supervision, examination and approval of cumbersome, investment to build a parking lot, involving more than a dozen departments, to cover a lot of chapters, very troublesome.
Haikou intelligent parking systems parking for one minute
Reporters arrived at the Haikou Guoxing Avenue Shengda square, practical experience and convenience of automatic parking building. First of all, the vehicle passes through the entrance and exit of the building, and the entrance and exit are the automatic identification system of the license plate, then the right turn comes to the garage. Choose a garage with the green light, the front towards the door, then the arrival of induction and automatically open car, the reporter ordered the car drove slowly into the storage spaces. Out of the door to inform the security guards on duty, the smart card is put in a brush screen, when the garage door closed, and flashing yellow light, the garage automatic lifting frame will traverse the car to find parking spaces and parking platform, the whole process takes about 1 minutes to complete. At the top of each garage entrance, there is a LED display which updates the parking information of the parking lot continuously.
When reporters are ready to drive away, the security card with a smart card in front of the garage door to operate the screen brush, the system will automatically exist in the garage of the car transported to the ground, the whole process is not more than 2 minutes.
It is understood that the parking lot in March 2015 officially put into operation, covering an area of about 700 square meters, parking lot of 13 floors, 3 floors underground, 10 floors on the ground, can accommodate more than 400 vehicles. Parking lot a daily average of 150 vehicles, most of the building workers and to "read and script" people. "Weekends will be less crowded, but there are also 100 vehicles on average." Parking-related responsible person said. A parking space for 300 yuan/months (according to the official standard fees); temporary parking within 10 minutes free; 5 yuan/hours; after each additional hour, plus 1 yuan, not more than 20 yuan within 24 hours.
When reporters are ready to drive away, the security card with a smart card in front of the garage door to operate the screen brush, the system will automatically exist in the garage of the car transported to the ground, the whole process is not more than 2 minutes.
It is understood that the parking lot in March 2015 officially put into operation, covering an area of about 700 square meters, parking lot of 13 floors, 3 floors underground, 10 floors on the ground, can accommodate more than 400 vehicles. Parking lot a daily average of 150 vehicles, most of the building workers and to "read and script" people. "Weekends will be less crowded, but there are also 100 vehicles on average." Parking-related responsible person said. A parking space for 300 yuan/months (according to the official standard fees); temporary parking within 10 minutes free; 5 yuan/hours; after each additional hour, plus 1 yuan, not more than 20 yuan within 24 hours.
2017年9月21日星期四
City Hospital of traditional Chinese medicine parking will be completed after the establishment of the province's record
It is understood that, at present, Changsha city in the province's first rise in the construction of the intelligent parking systems. Urban construction group chief engineer office deputy director Peng Lizhu introduced, a total of 7 parking lot and the selection and construction in 3 for the intelligent automatic parking lot, this is the first time in Liuyang to build the tower parking building.
The Chinese medicine hospital parking lot planning 503 berths (29 meters, 4.5 meters, 11 floors, 1 floors underground), Liuyang will become the highest, most of the parking spaces in the parking lot will hit the intelligent parking systems single capacity of the. The maximum capacity of the hospital put into operation in January last year our parking, 400 berths.
From the point of view of the use of land, the parking area covers only 3722 square meters, and in accordance with the traditional ground parking site allocation, the land should be more than 25000 square meters.
"Through intelligent, three-dimensional construction,(http://www.tadachina.com/) up and down in space." City Construction Group relevant responsible person said.
From the point of view of the use of land, the parking area covers only 3722 square meters, and in accordance with the traditional ground parking site allocation, the land should be more than 25000 square meters.
"Through intelligent, three-dimensional construction,(http://www.tadachina.com/) up and down in space." City Construction Group relevant responsible person said.
订阅:
博文 (Atom)