显示标签为“Hefei”的博文。显示所有博文
显示标签为“Hefei”的博文。显示所有博文

2017年10月17日星期二

Hefei Sanli Street Station took the lead in building parking lots during the year


Drove to the nearest subway station, after stopping, transfer to the subway to the destination, this way of travel, will not become a car family choice? At present, Hefei City Rail Transit P + R parking lot engineering design general contracting project completed the successful publicity, the winning unit for the Beijing Urban Construction Design Development Group Co., Ltd.
                      The tender includes a total of 5 P + R parking lots. Among them, the No. 3 line to build the public road station P + R complex, located on Huaihai Road and the intersection of the Great Road, southeast corner, with a total land area of 17,446 square meters, with a total construction area of About 87037 square meters, a total of seven parking floors, layer of the bus station, built to provide 616 parking spaces.

In addition, line 2 is proposed to be: Changning Avenue Station P + R parking building, with a total land area of 19,142 square meters, with a total construction area of About 17,596 square meters, 495 parking spaces can be provided after completion; Magnolia Avenue Station P + R underground parking building, with a total construction area of About 14,126 square meters, after the completion of the provision of 384 parking spaces; Jinzhai Road station a total of two garages, is underground parking systems, built to provide 90 parking spaces.

Relevant personage said the five parking lot will not start and plans to start this year is the East Line 2 P + R parking lot. The car park is located on the Yangtze River Road and East Ring Road intersection northwest corner, close to Sanli Street subway station. The total land area of the project is 3382 square meters, and the 7-storey automatic intelligent three-dimensional(parking systems) parking building will be built. 136 parking spaces are available.

2017年9月6日星期三

Hefei Wuhu Road, a 12 story intelligent parking system building

In the south of Hefei and Wuhu Road intersection, a 12-storey new comb exchange intelligent parking system. This garage covers an area of small, five flat parking spaces can stop 60 cars, 10 flat parking spaces can stop 120 cars, the lifting speed is fast, the safety performance is high, effectively alleviate the Wuhu road parking difficult problem.

the comb exchange intelligent parking system building