显示标签为“parking building”的博文。显示所有博文
显示标签为“parking building”的博文。显示所有博文

2017年10月17日星期二

Hefei Sanli Street Station took the lead in building parking lots during the year


Drove to the nearest subway station, after stopping, transfer to the subway to the destination, this way of travel, will not become a car family choice? At present, Hefei City Rail Transit P + R parking lot engineering design general contracting project completed the successful publicity, the winning unit for the Beijing Urban Construction Design Development Group Co., Ltd.
                      The tender includes a total of 5 P + R parking lots. Among them, the No. 3 line to build the public road station P + R complex, located on Huaihai Road and the intersection of the Great Road, southeast corner, with a total land area of 17,446 square meters, with a total construction area of About 87037 square meters, a total of seven parking floors, layer of the bus station, built to provide 616 parking spaces.

In addition, line 2 is proposed to be: Changning Avenue Station P + R parking building, with a total land area of 19,142 square meters, with a total construction area of About 17,596 square meters, 495 parking spaces can be provided after completion; Magnolia Avenue Station P + R underground parking building, with a total construction area of About 14,126 square meters, after the completion of the provision of 384 parking spaces; Jinzhai Road station a total of two garages, is underground parking systems, built to provide 90 parking spaces.

Relevant personage said the five parking lot will not start and plans to start this year is the East Line 2 P + R parking lot. The car park is located on the Yangtze River Road and East Ring Road intersection northwest corner, close to Sanli Street subway station. The total land area of the project is 3382 square meters, and the 7-storey automatic intelligent three-dimensional(parking systems) parking building will be built. 136 parking spaces are available.

2017年9月15日星期五

Test run of Luoyang automobile station stereoscopic parking building project

Recently, a new change has taken place at the Luoyang bus station! In the station, a two - stories gray building has sprung up, and some long distance passenger vehicles have stopped at this point. From the station managers understand that the station has been completed three-dimensional parking project, entered the trial last week.

Luoyang bus station of Luoyang bus station parking building project is located in Xigong road and Valley Road intersection, a total construction area of approximately 15149 square meters on the ground. Reporters on the scene saw the distance on the north side of the waiting hall of about 20 meters, has built a parking building on the ground floor there are two floors, about 13.5 meters high, single storey building about 6 meters, set up a total of 3 staircases, located in the west of the northwest side of the parking building, and on the north side of the 4 upper and lower ramp; are located in the east of the parking building. At present, the main body of the project has been completed, and a simple point sign has been set up on the ground floor of the parking lot. Some of the coaches are in and out of the parking lot and parked at the berth.


"Under normal circumstances, about 80 berths can be provided on each floor, and the additional 240 berths will be provided by the additional floor to meet the parking demand in the passenger station." According to the person in charge of the project, the problems encountered during the trial run stage will be collected and further improved. In the parking building officially put into use, will effectively ease the eleven golden weeks, Spring Festival passenger peak brought by the surrounding traffic pressure, improve public travel conditions, can be matched with the convergence of the Luoyang Railway Station Road passenger station.

2017年9月5日星期二

In August 21st, with the last one building completed, Jingjiling community parking building project into masonry, plastering, interior and exterior decoration stage.
In 4 months, 3 independent parking lots will be officially put into use. Then, 260 parking spaces will ease the Jingjiling community and surrounding residents parking problems, to improve the area traffic environment and beautify the appearance of the city, improve the city infrastructure has played a positive role.

260 parking spaces alleviate parking problems for community residents
Jingjiling parking building

In recent years, with the rapid development of the economy, Jingjiling within the community residential, shops, hotels and other buildings, also attracted a large number of foreign population housing occupancy.

The rapidly expanding population and limited land resources have further intensified the contradictions of inadequate infrastructure. Among them, the "parking difficult" problem is particularly evident.

It is difficult to alleviate the parking problems of residents by planning some parking spaces with limited space." Jingjiling community relevant responsible person said. By the end of 2016, Jingjiling community parking building project site began to clean up the surface...... At this moment, the long-awaited Jingjiling community residents.


The construction of "3 Tung independent parking building, a total construction area of 7820 square meters, of which 1# building area of 2705 square meters, 2# building area of 1723 square meters, 3# building area of 3392 square meters (including the basement area: 526 square meters)." Sanya City Bureau of the housing project site responsible person said, 1# and 3# parking for the 6 floors, building height of 16.75 meters; 2# parking for the 7 floors, the building height of 19.4 meters; 3# parking building the underground layer of the fire pump and water tank.


"The parking building(Other styles of parking http://www.tadachina.com/product.html) built after the will of Jingjiling community and surrounding areas to provide 260 parking spaces." The person in charge of the project said.


2017年8月14日星期一

Beijing this year 7 bus stereo parking building start building

4 million 300 thousand square meters - this is the Beijing permanent bus station site gap, where to find so much land to avoid parking in the street?
Public parking stereo parking lot map
Beijing bus group change ideas, bus station construction is undergoing the plane to the three-dimensional, from the inside of the city to the outside of the city, from the traditional to the modern three changes. This year, Beijing plans to start construction of 7 large three-dimensional parking buildings, with a special investment of 1.5 billion, to solve the problem of bus parking.
 Bus stereo parking
Three-dimensional bus parking tower built in Beijing four rings, five rings surrounding, unlike ordinary concrete parking building, this is a steel structure floor parking equipment, the driver only needs to be in the elevator position of bus parking, the system will shift to the vehicle parking spaces, a key to achieve automatic access to the bus. Upon completion, you can park 169 pure electric buses, 84 cars, and will be built with 20 buses charging piles, convenient electric bus charging.


2017年8月8日星期二

Build a three-dimensional parking garage to solve the parking problem

According to the continuous increase of vehicles, car number shortage, the national development, and Reform Commission and other departments issued a "guidance" on the strengthening of city parking facilities construction, to encourage the construction of underground parking, parking building, parking lots and other intensive parking facilities, improve the parking problem.

Vertical lifting type parking equipment (abbreviation):



Vertical lifting stereo garage advantages: save space, reduce cost, low noise, small vibration, small occupied area, and building good compatibility, using the latest elevator principle and comb switching technology, energy saving, safe and fast, using vector frequency control, speed control, convenient operation, automatic completion of vehicle access the equipment, economic, safe, rapid and beautiful; while using the intelligent security system, to the person, car automatic detection, ensure safety, simple operation, control by computer, with Tibetan car turntable, convenient vehicle import library.