2017年9月5日星期二

In August 21st, with the last one building completed, Jingjiling community parking building project into masonry, plastering, interior and exterior decoration stage.
In 4 months, 3 independent parking lots will be officially put into use. Then, 260 parking spaces will ease the Jingjiling community and surrounding residents parking problems, to improve the area traffic environment and beautify the appearance of the city, improve the city infrastructure has played a positive role.

260 parking spaces alleviate parking problems for community residents
Jingjiling parking building

In recent years, with the rapid development of the economy, Jingjiling within the community residential, shops, hotels and other buildings, also attracted a large number of foreign population housing occupancy.

The rapidly expanding population and limited land resources have further intensified the contradictions of inadequate infrastructure. Among them, the "parking difficult" problem is particularly evident.

It is difficult to alleviate the parking problems of residents by planning some parking spaces with limited space." Jingjiling community relevant responsible person said. By the end of 2016, Jingjiling community parking building project site began to clean up the surface...... At this moment, the long-awaited Jingjiling community residents.


The construction of "3 Tung independent parking building, a total construction area of 7820 square meters, of which 1# building area of 2705 square meters, 2# building area of 1723 square meters, 3# building area of 3392 square meters (including the basement area: 526 square meters)." Sanya City Bureau of the housing project site responsible person said, 1# and 3# parking for the 6 floors, building height of 16.75 meters; 2# parking for the 7 floors, the building height of 19.4 meters; 3# parking building the underground layer of the fire pump and water tank.


"The parking building(Other styles of parking http://www.tadachina.com/product.html) built after the will of Jingjiling community and surrounding areas to provide 260 parking spaces." The person in charge of the project said.


没有评论:

发表评论